(410) 844-5578
Tidemark Build Co
About US Our ProcessService Area
Construction ManagementCustom Home BuildingKitchens & BathsPre-ConstructionWhole-Home RemodelsAll Services
Edgewater & Mayo, MDAnnapolisSeverna Park, MDPasadena, MDKent Island
Spa Creek FarmhouseMayo Beach RenovationKent Island Kitchen & Great Room Severna Park AdditionAll Projects
CareersBlogContactGallery
(410) 844-5578· Call us directly
Tidemark Build Co

(410) 844-5578

hello@tidemarkbuild.com

214 Chinquapin Round Rd, Annapolis, MD

Our Company

  • About US
  • Our Process
  • Service Area

Our Services

  • Construction Management
  • Custom Home Building
  • Kitchens & Baths
  • Pre-Construction
  • Whole-Home Remodels
  • All Services

Location

  • Edgewater & Mayo, MD
  • Annapolis
  • Winchester, VA
  • Severna Park, MD
  • Pasadena, MD
  • Kent Island

Our Projects

  • Spa Creek Farmhouse
  • Mayo Beach Renovation
  • Kent Island Kitchen & Great Room
  • Severna Park Addition
  • All Projects

© 2026 Tidemark Build Co. All rights reserved.

Equal Housing Opportunity
Licensed Home Builder

Loading...

Projects/Kitchen & Interior Remodel/Kent Island Kitchen & Great Room
Kitchen & Interior Remodel

Kent Island Kitchen & Great Room

Annapolis, MD

Kent Island Kitchen & Great Room

Overview

The Whitfields bought their Kent Island home in 2002 for the water view — and spent the next twenty years walking into a kitchen that faced a wall. The great room felt disconnected from the outdoors. The back of the house, which should have been the best part, was an afterthought. They came to us with a clear goal: make the inside of the house feel as good as the outside does. We removed the wall between the kitchen and the great room, reoriented the island toward the rear of the house, built a coffered ceiling above the great room with a gas fireplace centered on the interior wall, and installed three sets of french doors across the rear of the space. The Chester River is now visible from every seat at the table.

 

Scope of Work

Full kitchen renovation with island reorientation, great room remodel with coffered ceiling and gas fireplace, load-bearing wall removal with structural beam, three sets of french doors, and MEP conflict resolution including drain stack reroute.

Why Pre-Construction Pays for Itself

Most remodeling surprises aren't really surprises — they're things nobody looked for before work started. A drain stack in the wrong place. A beam where the opening was supposed to go. An electrical panel that can't support the new load. Our pre-construction process exists to find these things before they become change orders. On the Kent Island project, we identified a major plumbing reroute six weeks before demo day. Resolved in planning: it was a line item. Discovered during demo: it would have been a delay, a cost escalation, and a conversation nobody wants to have. We do the work upfront so the build goes cleanly.

The Kitchen

The new kitchen is oriented toward the Chester River — the island runs perpendicular to the rear wall, creating a natural work triangle between the range, the sink, and the refrigerator while keeping the cook facing the water. Countertops are a leathered quartzite in a warm cream tone. Cabinetry is a soft sage green on the perimeter with a contrasting natural white oak island. The range hood is custom steel with a brushed finish. Under-cabinet lighting on a dimmer. A pot filler above the range the Whitfields debated for three months and say they use every day.

The French Doors

Three sets of outswing french doors across the rear of the great room was the feature the Whitfields were most nervous about — specifically, whether the glass would make the space feel cold in winter and whether the doors would seal properly against wind off the water. We specified thermally broken aluminum frames with triple-point locking hardware and low-e glass with a solar heat gain coefficient optimized for south-facing Maryland exposure. In winter, the space is warm. In summer, with all three sets open, the back of the house and the dock feel like one continuous room. That was the goal.

Case Study

Challenge

Relocating the kitchen required moving a 3-inch drain stack that ran through the exterior wall — rerouting it without opening the exterior meant threading new drain lines through the basement ceiling, a sequencing challenge that had to be fully resolved before demolition began. Discovering this mid-demo would have added two to three weeks and a significant change order to the project.

Solution

Our pre-construction process includes a full MEP (mechanical, electrical, plumbing) conflict review on every project that involves plumbing or electrical changes. We identified the drain stack conflict six weeks before the first wall came down, designed the reroute in coordination with our plumbing sub, priced it into the contract, and built the sequence into the construction schedule. The Whitfields never heard about it until we told them during the project recap — as an example of what pre-construction is worth.

Results

Demo to substantial completion ran nine weeks. The Whitfields hosted Thanksgiving in the finished space — 24 guests, three sets of french doors open to the dock, exactly what they had described to us in our first meeting. The coffered ceiling and gas fireplace became the focal points of a home they had been considering selling. They are not selling.

Project Facts

Client industry
Residential
Business unit
Interior Remodel
Location
Annapolis, MD
Size
1,100 sq ft
Project value
285000
Start
Aug 2025
Completed
Nov 2025

Services Performed

Construction ManagementKitchens & BathsWhole-Home RemodelsPre-Construction
Free Estimate

Related Projects

1 | 3
Spa Creek Farmhouse

Annapolis, MD

Spa Creek Farmhouse

Read more
Mayo Beach Renovation

Annapolis, MD

Mayo Beach Renovation

Read more
 Severna Park Addition

Lake Shore, MD

Severna Park Addition

Read more

Not Sure Which Service You Need?

Tell us about your project and our Upper Marlboro team will recommend the right approach — with a free, no-obligation estimate.

Free Estimate